Abtak Logo

Other News

Stay updated with the latest Other news, articles, and insights from trusted sources. Explore in-depth coverage and expert analysis on Other topics.

31
OtherJul 08, 2025 08:17 PM

Mumbai-Ahmedabad Bullet Train Corridor: Bridge Over Daman Ganga River In Gujarat Now Complete

ALSO READ: Chennai Power Cut On July 9: TANGEDCO Announces Shutdown On Wednesday; Check List Of Areas The length of the river bridge is 360 meters, consisting of nine full-span girders. The height of the Pier is 19 metres to 29 metres. This bridge is between Boisar and Vapi Bullet Train station. Another river bridge that has already been completed between these two stations is the Darotha river bridge. This river is around 1 km from the Vapi Bullet Train station and 61 km from the Boisar Bullet Train station.

Comments